Inhaltsverzeichnis

Alle Kapitel aufklappen
Alle Kapitel zuklappen
Preface
13
Target Audience
13
How to Read This Book
14
How This Book Is Organized
15
Conclusion
16
Acknowledgments
17
1 Introduction to Capacity Planning
19
1.1 Why Capacity Planning Matters in Manufacturing
19
1.1.1 Balancing Workloads
20
1.1.2 Avoiding Bottlenecks
21
1.1.3 Reducing Idle Time
22
1.2 Strategic Benefits
22
1.2.1 Improved Delivery Performance
22
1.2.2 Cost Optimization
23
1.2.3 Production Stability
23
1.3 Capacity Planning with SAP
24
1.3.1 Within Production Planning
24
1.3.2 Transactions CM* Versus SAP Fiori Apps
26
1.4 Phases of Capacity Planning
34
1.4.1 Short-Term Firefighting
34
1.4.2 Medium-Term Balancing
35
1.4.3 Long-Term Strategic Alignment
36
1.5 Key Elements for Capacity Planning
37
1.5.1 Work Centers, Capacity Categories, and Work Center Groups
37
1.5.2 Standard Value Keys, Formulas, and Operation
38
1.5.3 Order Types
39
1.6 Summary
39
2 Configuring Capacity Planning
41
2.1 Initial Configuration
42
2.1.1 Capacity Category
42
2.1.2 Capacity Planner
43
2.1.3 Available Capacity
44
2.1.4 Formulas
49
2.2 Scheduling
54
2.2.1 Relevant Settings for Scheduling
55
2.2.2 Production Orders Scheduling Parameters
60
2.2.3 Planned Order Scheduling Parameters
67
2.2.4 Scheduling Margin Key
75
2.3 Order Control and Availability Checks
76
2.4 Overall Profile for Capacity Availability Check
80
2.4.1 Selection Profile
83
2.4.2 Control Profile
85
2.4.3 Time Profile
87
2.4.4 Evaluation Profile
90
2.4.5 Strategy Profile
92
2.4.6 Period Profile
94
2.5 Overall Profile for Capacity Leveling
96
2.5.1 Selection Profile
99
2.5.2 Control Profile
100
2.5.3 Time Profile
100
2.5.4 Evaluation Profile
101
2.5.5 Strategy Profile
102
2.5.6 Capacity Planning Table (Tabular) Profile
102
2.5.7 Capacity Planning Table (Graphic) Profile
104
2.5.8 List Profile
106
2.6 Control Key
107
2.7 SAP User Roles
109
2.8 Install SAP liveCache for SAP Fiori Apps
112
2.9 Summary
113
3 Master Data Capacity Planning
115
3.1 Material Master
115
3.1.1 Scheduling Margin Key
116
3.1.2 Availability Check
118
3.1.3 Production Supervisor and Production Scheduling Profile
119
3.1.4 Production Version
120
3.2 Bill of Materials
123
3.2.1 Header Attributes
123
3.2.2 Components
126
3.3 Work Center/Resources
127
3.3.1 Setup and Data Elements
127
3.3.2 Basic Data
130
3.3.3 Default Values
132
3.3.4 Capacity
134
3.3.5 Scheduling
139
3.3.6 Manage Work Center Groups
144
3.4 Routing
150
3.4.1 Setup and Data Elements
151
3.4.2 Header
152
3.4.3 Sequence
156
3.4.4 Operation Overview
160
3.4.5 Assigning Material Components to Operations/Suboperations
168
3.5 Reference Master Data Model for Capacity Planning
170
3.6 Summary
171
4 Calculating Capacity Requirements
173
4.1 Introduction to Capacity Requirement
173
4.2 Sources of Capacity Requirements
174
4.3 Distribution of Capacity Requirements
181
4.4 Cumulation of Available Capacities and Requirements
186
4.4.1 Work Center Hierarchy
187
4.4.2 Available Cumulation Functions
188
4.5 Reducing Capacity Requirements
193
4.6 Summary
195
5 Capacity Scheduling
197
5.1 Elements of Scheduling
197
5.2 Calculation Rules for Scheduling
200
5.3 Scheduling Levels
210
5.4 Material Requirements Planning Run
212
5.5 Finite Scheduling
218
5.6 Midpoint Scheduling
219
5.7 Summary
220
6 Capacity Evaluation and Monitoring
223
6.1 Standard Capacity Evaluation Reports Overview
224
6.2 Manage Work Center Capacity App
233
6.2.1 Application Overview
233
6.2.2 Area of Responsibility
235
6.2.3 Load Personalization
236
6.2.4 Visual Checkboxes and Traffic Lights
237
6.2.5 Worklist Management and Columns Definition
237
6.2.6 Detection of Overloads and Underloads
239
6.3 Mass Maintenance of Work Center Capacity App
249
6.4 Evaluate Capacity App
254
6.5 Extended Evaluation Reports
259
6.6 Work Center Capacity Jobs
266
6.7 Summary
270
7 Capacity Leveling
271
7.1 Planning Tables for Capacity Leveling
272
7.1.1 Tabular Planning Table
274
7.1.2 Graphical Planning Table
288
7.2 SAP Fiori-Based Scheduling
291
7.2.1 Capacity Scheduling Table
293
7.2.2 Capacity Scheduling Board
312
7.3 Summary
323
8 Integration with Other Functions
325
8.1 Integration with Planning Tools
325
8.1.1 Sales and Operations Planning and Long-Term Planning
326
8.1.2 Material Requirements Planning
339
8.2 Integration with Production Execution, Service, and Project System
351
8.2.1 Discrete Manufacturing, Process Industries, and Repetitive Manufacturing
352
8.2.2 Plant Maintenance
359
8.2.3 Project System
364
8.3 Summary
367
9 Enhancements and Artificial Intelligence Capabilities
369
9.1 Enhancing Capacity Planning
370
9.1.1 Extensibility for Capacity Planning Using SAP Fiori Apps
370
9.1.2 UI Adaptations
382
9.1.3 Core Data Services Views and Analytic Extensions
384
9.1.4 Situation Handling
385
9.2 SAP Business AI
386
9.3 SAP Business Technology Platform
388
9.4 Summary
388
A Production Planning and Detailed Scheduling
391
A.1 Solution Overview
392
A.2 When to Use Production Planning/Detailed Scheduling
394
A.3 Summary
396
The Authors
397